2025 Sewer Cleaning Starts September 8th

web@dminUncategorized

The Town of Niverville would like to make residents aware that its 2025 Sewer Cleaning is expected to start Monday, September 8th, 2025, and last for 1 to 2 weeks.

Generally, the streets affected by sewer cleaning this year are:
• Main Street from CPKC tracks to 5th Avenue
• 3rd Avenue North and 3rd Avenue South from Main Street to 86 3rd Ave South
• All streets south of 40 Claremont Drive and 40 Hampton Drive, and east of Ellington Way, Kirkdale Drive, and Wyndham Court.

You can find detailed maps of the 2025 Sewer Cleaning locations here.

Occasionally during sewer cleaning, air pressure builds in the sewer line causing water to splash out of toilets, sinks, and drains. Please take the following precautions to prevent water damage in your home:
• Close lids and cover toilet bowls when not in use.
• Insert drain plugs in all sinks and bathtubs when not in use.
• Remove all floor mats in bathrooms.
• Place an old towel around the base of toilets.
• Cover all basement floor drains.

Sewer cleaning on rare occasions may leave an odor in the home. If this is the case, run some water down all the sink and bathtub drains, flush toilets, pour a pail of water into each basement floor drain, and open your windows. After a short time, the odor should go away.

Please reach out to feedback@whereyoubelong.ca if you have any questions.